Aultman Biplane Suite
Canton, OH
Aultman Hospital
Hammond renovated an existing 1,200 square foot space on the lower level of Aultman Hospital to hold the new Interventional Biplane machine. Construction involved setting structural steel and a new concrete slab on the inside the existing hospital space. Structural ceiling support, new mechanical systems and finish upgrades were also completed. Much of the work was completed at night to avoid operational impacts and noise disturbances. This project required extensive coordination with hospital staff and involved ICRA planning and execution.